Anamosa, Iowa — serving Illinois
Custom metal fabrication and welding for Illinois
Illinois manufacturers often need a regional fabrication partner that can support both engineered one-offs and scheduled production releases. From eastern Iowa, Engineered Welding serves Illinois OEMs with fabricated weldments, hydraulic reservoirs, brackets, frames, and assemblies built from customer drawings.
- Upload a DWG, DXF, STEP, or PDF and we quote straight from it
- AWS D1.1 certified welding, robotic and manual
- Cutting, forming, welding, leak testing, and finishing under one roof
- Over 80,000 hydraulic reservoirs delivered since 2002
Get a fast quote
Tell us roughly what you need and attach your drawing if you have one. We come back with questions and a price — no full spec required to start.
- 2002
- Fabricating in Iowa since
- 80,000+
- Hydraulic reservoirs delivered
- AWS D1.1
- Certified MIG welding
- One part
- Minimum order
Industries we serve
Who we build for in Illinois
Illinois combines heavy industry, agricultural equipment, material handling, construction machinery, and a large base of OEM suppliers. Our location west of the Mississippi makes the Quad Cities especially practical, while freight lanes support customers from Rockford and Peoria to the Chicago area and central Illinois.
Industrial machinery and OEM equipment
Welded frames, brackets, guards, bases, and subassemblies built to print for machinery manufacturers and equipment integrators.
Material handling and warehouse equipment
Fabricated structures and hydraulic components for conveyors, lifts, handling systems, and mobile equipment.
Agricultural and construction equipment
Production weldments, tanks, and mounting structures for farm, landscape, and compact construction machinery.
Maintenance and replacement fabrication
Reverse-engineered or print-based replacement components for plants that need a durable part without redesigning the entire machine.
Capabilities
Fabrication services for Illinois OEM programs
Our core work is engineered fabrication: parts that start with a customer print and need controlled forming, welding, inspection, and finishing before they reach an assembly line.
Custom metal fabricationBuilt from your drawings, CAD files, or a physical sample.
Production weldmentsRepeatable robotic MIG welding for ongoing OEM runs.
Hydraulic reservoir tanksSteel and stainless tanks with custom ports, baffles, and mounting.
Welded assembliesFrames, brackets, guards, platforms, and multi-part assemblies.
Prototype and short runOne-off parts and first articles before you commit to production.
Repair and modificationRework and reinforcement on existing equipment and components.
Why Illinois manufacturers use us
A regional source for print-to-part fabrication
Illinois buyers use us when they want one accountable shop for the fabricated portion of a job. We coordinate cutting, forming, welding, inspection, leak testing where required, and finishing so purchasing and engineering have a clear path from drawing to finished component.
The work you cannot see in a photo is the rework we did not have to do.
Recent work
Examples from our Midwest fabrication shop




Shop details
Materials, processes, and quantities
| Materials | Carbon steel, stainless steel, and aluminum |
|---|---|
| Welding | AWS D1.1 certified MIG welding, robotic and manual |
| In-house process | Plasma cutting, press brake forming, welding, leak testing, and finishing |
| Quantities | One-off prototypes through ongoing production runs |
| Quoting from | DWG, DXF, STEP, PDF prints, or a physical sample |
| Hydraulic tanks | Custom ports, baffles, drains, breathers, sight gauges, and mounting |
| Finishes | Powder coating, paint to your color, primed, or bare |
| Documentation | First article inspection and material certs available on request |
| Operating since | 2002 |
Service area
Serving manufacturers across Illinois
The Quad Cities are a natural service corridor from our Anamosa shop, and we also ship throughout Illinois. For production work, customers can approve a first article and then release repeat quantities without moving the job between multiple vendors.
Chicago, Rockford, Peoria, Moline, Rock Island, Springfield, Joliet, Aurora, Decatur, Bloomington, and every other community in Illinois.
Questions
What Illinois customers ask
Can you handle repeat production runs for an Illinois OEM?
Yes. Production weldments are a core part of our business. After a first article is approved we keep the fixtures and robotic programs, so later releases match. Many customers set up blanket orders with scheduled releases instead of reordering each time.
What size hydraulic reservoir do I need?
A common starting point is two to three times the pump's flow rate in GPM, so a 20 GPM pump suggests a 40 to 60 gallon reservoir. That is only a starting point. Duty cycle, heat load, cylinder volume, and available cooling all move the number, and mobile equipment often needs a smarter design rather than a bigger tank because the space and the airflow are both limited. Tell us the pump flow and how hard the system works and we will talk it through before anything gets cut.
What do baffles do, and does my tank need them?
Baffles are internal plates that force returning oil to take the long way around before the pump picks it up again. That extra dwell time lets air separate out and contaminants settle instead of getting pulled straight back into the system. They also stiffen the tank walls against pump pulsation, which reduces fatigue cracking at the welds over time. Most reservoirs benefit from at least one; the height and placement depend on your flow rate and tank geometry.
Should my tank be carbon steel or stainless?
Carbon steel is the default and it is the right answer for most builds. It is strong, economical, welds well, and takes powder coat well. Stainless makes sense when the environment demands it: washdown areas, food and beverage plants, marine or coastal equipment, or corrosive chemical exposure. Most systems do not need stainless, but the ones that do really do. Describe the operating environment and we will tell you honestly whether the premium is worth paying.
Are your welders certified?
Yes. We weld to AWS D1.1, the structural steel code, using robotic MIG for production repeatability and manual MIG or TIG where the joint calls for it. If your parts carry load or go into a safety-critical application, ask us for the specifics and we will give them to you.
Do you subcontract any of the welding or fabrication?
No. Plasma cutting, press brake forming, welding, leak testing, and finishing all happen in our own shop in Anamosa. That is worth asking any fabricator, because outsourced work means nobody can tell you who actually touched your part or what their process was.
What happens if a part fails first article inspection?
We find the cause before the production run starts, not after. That is the entire point of a first article. Over 80,000 hydraulic reservoirs have shipped from this shop with zero defects, and that record comes from catching problems at the first part rather than the hundredth.
Can you provide material certs and traceability?
Yes. First article inspection reports and mill certifications for raw material are available on request. If traceability is a contractual requirement on your end, tell us at the quote stage so it is built into the job rather than added on later.
What do you need from me to quote a job?
A print in DWG, DXF, STEP, or PDF form is fastest, and you can attach it directly to the quote form on this page. If you do not have a drawing, send photos of the part with overall dimensions and material thickness, or ship us a sample. For a hydraulic tank, we need capacity, envelope dimensions, material, port sizes and locations, mounting style, and finish.
Do you do one-off parts or only production runs?
Both, and there is no minimum order. We build single replacement parts and prototypes alongside ongoing production weldments. Repeat designs move to robotic welding once the first article is approved, which is what keeps later runs consistent and the per-part price down.
What is your typical lead time?
It depends on size, quantity, material availability, and current shop load. Tell us your required in-service date when you request the quote and we will confirm up front whether we can hit it, rather than finding out after you have placed the order.
Send us your drawing
Send the drawing, expected quantity, material, finish, and required date. If the design is still evolving, send the current revision and tell us what is not final—we can quote the known scope and flag the details that need resolution.





