Anamosa, Iowa — serving Indiana
Custom metal fabrication and welding for Indiana
Indiana equipment builders and industrial manufacturers rely on welded components across agriculture, material handling, construction, and factory automation. We supply print-based fabrication and custom hydraulic reservoirs from our Midwest shop in Anamosa, Iowa.
- Upload a DWG, DXF, STEP, or PDF and we quote straight from it
- AWS D1.1 certified welding, robotic and manual
- Cutting, forming, welding, leak testing, and finishing under one roof
- Over 80,000 hydraulic reservoirs delivered since 2002
Get a fast quote
Tell us roughly what you need and attach your drawing if you have one. We come back with questions and a price — no full spec required to start.
- 2002
- Fabricating in Iowa since
- 80,000+
- Hydraulic reservoirs delivered
- AWS D1.1
- Certified MIG welding
- One part
- Minimum order
Industries we serve
Who we build for in Indiana
Indiana customers are often looking for a fabrication source that can move from a first article into repeat production without changing the process every release. We support that with in-house forming and welding, documented job setup, and robotic MIG where it makes sense.
Agricultural and construction machinery
Frames, brackets, tanks, and welded subassemblies for mobile and off-road equipment.
Material handling and logistics equipment
Fabricated structures and hydraulic components for lifts, conveyors, trailers, and warehouse systems.
Industrial automation
Machine bases, guarding structures, support weldments, and fabricated components for factory equipment.
OEM production weldments
Repeat parts built from customer drawings with fixtures and controlled weld sequences for consistency.
Capabilities
Fabrication capabilities for recurring OEM work
We build prototypes, replacement parts, and repeat weldments with the same goal: a clear process that produces the geometry and weld quality called out on the print.
Custom metal fabricationBuilt from your drawings, CAD files, or a physical sample.
Production weldmentsRepeatable robotic MIG welding for ongoing OEM runs.
Hydraulic reservoir tanksSteel and stainless tanks with custom ports, baffles, and mounting.
Welded assembliesFrames, brackets, guards, platforms, and multi-part assemblies.
Prototype and short runOne-off parts and first articles before you commit to production.
Repair and modificationRework and reinforcement on existing equipment and components.
Why Indiana manufacturers use us
Repeat work without reinventing the job
For OEM work, we capture the manufacturing method during the first article: fit-up, fixture points, weld sequence, inspection, and finishing. That retained process knowledge is what helps the next order match the last one.
The work you cannot see in a photo is the rework we did not have to do.
Recent work
Shop-built weldments and hydraulic components




Shop details
Materials, processes, and quantities
| Materials | Carbon steel, stainless steel, and aluminum |
|---|---|
| Welding | AWS D1.1 certified MIG welding, robotic and manual |
| In-house process | Plasma cutting, press brake forming, welding, leak testing, and finishing |
| Quantities | One-off prototypes through ongoing production runs |
| Quoting from | DWG, DXF, STEP, PDF prints, or a physical sample |
| Hydraulic tanks | Custom ports, baffles, drains, breathers, sight gauges, and mounting |
| Finishes | Powder coating, paint to your color, primed, or bare |
| Documentation | First article inspection and material certs available on request |
| Operating since | 2002 |
Service area
Serving manufacturers across Indiana
Indiana is served as a regional freight market from our Anamosa facility. New projects can begin with CAD and print review; after first-article approval, production releases can ship directly to your plant or assembly partner.
Indianapolis, Fort Wayne, Evansville, South Bend, Elkhart, Lafayette, Bloomington, Muncie, Kokomo, Terre Haute, and every other community in Indiana.
Questions
What Indiana customers ask
Can you build a part to fit an unusual space?
That is most of what we do. L-shaped, stepped, side-mount, and low-profile designs are routine here. Give us the envelope you have and the capacity or strength you need, and we design the shape around it.
What size hydraulic reservoir do I need?
A common starting point is two to three times the pump's flow rate in GPM, so a 20 GPM pump suggests a 40 to 60 gallon reservoir. That is only a starting point. Duty cycle, heat load, cylinder volume, and available cooling all move the number, and mobile equipment often needs a smarter design rather than a bigger tank because the space and the airflow are both limited. Tell us the pump flow and how hard the system works and we will talk it through before anything gets cut.
What do baffles do, and does my tank need them?
Baffles are internal plates that force returning oil to take the long way around before the pump picks it up again. That extra dwell time lets air separate out and contaminants settle instead of getting pulled straight back into the system. They also stiffen the tank walls against pump pulsation, which reduces fatigue cracking at the welds over time. Most reservoirs benefit from at least one; the height and placement depend on your flow rate and tank geometry.
Should my tank be carbon steel or stainless?
Carbon steel is the default and it is the right answer for most builds. It is strong, economical, welds well, and takes powder coat well. Stainless makes sense when the environment demands it: washdown areas, food and beverage plants, marine or coastal equipment, or corrosive chemical exposure. Most systems do not need stainless, but the ones that do really do. Describe the operating environment and we will tell you honestly whether the premium is worth paying.
Are your welders certified?
Yes. We weld to AWS D1.1, the structural steel code, using robotic MIG for production repeatability and manual MIG or TIG where the joint calls for it. If your parts carry load or go into a safety-critical application, ask us for the specifics and we will give them to you.
Do you subcontract any of the welding or fabrication?
No. Plasma cutting, press brake forming, welding, leak testing, and finishing all happen in our own shop in Anamosa. That is worth asking any fabricator, because outsourced work means nobody can tell you who actually touched your part or what their process was.
What happens if a part fails first article inspection?
We find the cause before the production run starts, not after. That is the entire point of a first article. Over 80,000 hydraulic reservoirs have shipped from this shop with zero defects, and that record comes from catching problems at the first part rather than the hundredth.
Can you provide material certs and traceability?
Yes. First article inspection reports and mill certifications for raw material are available on request. If traceability is a contractual requirement on your end, tell us at the quote stage so it is built into the job rather than added on later.
What do you need from me to quote a job?
A print in DWG, DXF, STEP, or PDF form is fastest, and you can attach it directly to the quote form on this page. If you do not have a drawing, send photos of the part with overall dimensions and material thickness, or ship us a sample. For a hydraulic tank, we need capacity, envelope dimensions, material, port sizes and locations, mounting style, and finish.
Do you do one-off parts or only production runs?
Both, and there is no minimum order. We build single replacement parts and prototypes alongside ongoing production weldments. Repeat designs move to robotic welding once the first article is approved, which is what keeps later runs consistent and the per-part price down.
What is your typical lead time?
It depends on size, quantity, material availability, and current shop load. Tell us your required in-service date when you request the quote and we will confirm up front whether we can hit it, rather than finding out after you have placed the order.
Send us your drawing
Send the current drawing and expected quantity for your Indiana project. If you have an annual volume but buy in smaller releases, include both numbers—we can evaluate the job as a production program rather than a one-time batch.





